Skip to content
Get in touch
Is There Help to Fund This?

Mount Prospect pilotEdition 2026-08

Return to Worlds

Canonical program record

ComEd Small Business Energy Savings

Authorized ComEd service providers assess eligible small-business facilities and guide qualifying electric-efficiency upgrades through installation and incentive processing.

What this mechanism does

Mechanism type
A bundled utility pathway combining a no-cost assessment, measure selection, installation support, and incentive processing.
Economic effect
Lower the project cost
Administrator
Commonwealth Edison Company
Amount or value
A no-cost assessment plus project-specific incentives; no general award amount is promised.
Cash-flow timing
Incentives follow program review and approval; confirm whether an instant discount or later payment applies.
Upfront cash
Required
Repayment
Not a repayable mechanism
Program lifecycle
Current / rolling
Visitor treatment
Worth checking now

This current pathway still requires program-specific eligibility and sequence checks.

Important dates and consequences

Confirm ComEd reservation or preapproval before a project commitment

Date or rangeBefore ordering equipment, signing a contract, or beginning work when the measure requires reservation or preapproval

A commitment made before the required ComEd sequence may make the measure ineligible; the authorized provider must confirm the exact rule.

Date last verified

General 2026 Kickstart preapplication period ended March 31, 2026

Date or range2025-11-17 through 2026-03-31

Do not present the general Kickstart bonus as available; evaluate the underlying current small-business pathway and any measure-specific reservation separately.

Date last verified

Project fit and limits

Eligibility conditions to confirm

  • The business must have an eligible active ComEd account and qualifying measures.
  • Current 2026 first-party material describes small-business eligibility as electrical peak demand under 500 kW.
  • Each proposed measure and account must be reviewed by ComEd or an authorized provider.

Eligible costs described by the authority

  • Qualifying lighting, HVAC, and other electric-efficiency upgrades identified through the program

Ineligible or excluded costs

  • Measures or accounts ComEd does not approve
  • Work that misses any required project reservation or preapproval sequence

Friction to plan for

  • Use an authorized service provider and confirm whether project reservation or preapproval is required before ordering, signing, or starting work.
  • The 2026 general Kickstart preapplication period has passed, and Mount Prospect eligibility for Select Communities was not established.
  • Offers and actual savings vary by customer, measure, usage, and program rules.

Stackability evidence

Conditional relationship

Scope: A qualifying joint ComEd and Nicor measure.

Nicor generally prohibits duplicate rebates for the same product but recognizes qualifying joint ComEd and Nicor offers.

  • Both utilities must confirm that the exact measure is a qualifying joint offer.
  • Each program's account, installation, documentation, and approval rules still apply.

Rule last verified

Unknown — ask

Scope: The same electric-efficiency project or cost.

Both programs may appear relevant, but no authoritative source establishes that Village and ComEd benefits can fund the same cost.

  • Obtain written cost-allocation and sequencing guidance from both administrators before commitments.

Can both programs support this exact project, and how must eligible costs, incentives, and approvals be sequenced?

Rule last verified

Unknown — ask

Scope: Electric-efficiency work included in a broader storefront or build-out project.

No authoritative source confirms outside utility incentives can be combined with the advertised Village grant.

  • Confirm current Village funding first.
  • Obtain written cost-allocation and preapproval guidance from both administrators.

May the same project use both programs if no cost is reimbursed twice, and which approval must occur first?

Rule last verified

Unknown — ask

Scope: C-PACE financing for project cost remaining after a ComEd incentive.

The records establish both mechanisms but not their transaction-specific cost allocation or closing sequence.

  • The owner, capital provider, County program, ComEd, and any mortgage lender must accept the structure.
  • Do not automatically net or total values.

May the C-PACE assessment finance the approved remaining cost after ComEd, and what documentation and sequence are required?

Rule last verified