Skip to content
Get in touch
Is There Help to Fund This?

Mount Prospect pilotEdition 2026-08

Return to Worlds

Canonical program record

Nicor Gas Commercial Prescriptive Rebates

Active commercial Nicor Gas customers may request rebates for qualifying high-efficiency natural-gas equipment installed and operating during the 2026 program year.

What this mechanism does

Mechanism type
Rebate
Economic effect
Lower the project cost
Administrator
Nicor Gas Energy Efficiency Program
Amount or value
Measure-specific 2026 rebate amounts; final value depends on approved equipment and available funds.
Cash-flow timing
Rebate after installation, complete application, review, and approval; Nicor states typical processing is approximately six to eight weeks.
Upfront cash
Required
Repayment
Not a repayable mechanism
Program lifecycle
Current / deadline
Visitor treatment
Worth checking now

This current pathway has a material deadline or timing condition that must be checked.

Important dates and consequences

Qualifying equipment must be installed and operational during 2026

Date or range2026-01-01 through 2026-12-31

A measure outside the 2026 installation period will not qualify under this edition's terms and requires a fresh program-year review.

Date last verified

Apply within 90 days of installation or by January 31, 2027, whichever comes first

Date or rangeEarlier of 90 days after installation or 2027-01-31

A late submission may not be accepted and requires Nicor review; no 2026 rebate payment should be assumed.

Date last verified

Project fit and limits

Eligibility conditions to confirm

  • The installation site must have an eligible active commercial Nicor Gas account.
  • Equipment, contractor, rate-class, installation, invoice, and documentation rules must be met.
  • The product must be installed and fully operational before the rebate application is submitted.

Eligible costs described by the authority

  • Qualifying 2026 commercial natural-gas equipment and services listed by Nicor Gas

Ineligible or excluded costs

  • Used, rebuilt, rented, leased, warranty-replacement, or prize equipment
  • Measures that do not meet the current application requirements
  • Duplicate rebates for the same product except a qualifying joint offer described by Nicor Gas

Friction to plan for

  • Installation must occur during 2026 and the application deadline is the earlier of 90 days after installation or January 31, 2027.
  • Offers remain subject to available funds and complete documentation.

Stackability evidence

Prohibited combination

Scope: The same natural-gas efficiency measure.

Nicor custom incentives are for qualifying projects not eligible for a prescriptive rebate, so the same measure cannot receive both pathways.

  • Separate measures may be screened independently by Nicor.
  • Nicor's written classification controls.

Rule last verified

Conditional relationship

Scope: A qualifying joint ComEd and Nicor measure.

Nicor generally prohibits duplicate rebates for the same product but recognizes qualifying joint ComEd and Nicor offers.

  • Both utilities must confirm that the exact measure is a qualifying joint offer.
  • Each program's account, installation, documentation, and approval rules still apply.

Rule last verified

Unknown — ask

Scope: The same natural-gas efficiency project or cost.

The Village advertisement and Nicor rules do not establish cross-program stackability for the same cost.

  • Obtain written Village and Nicor guidance before ordering equipment or counting both values.

Can both programs support this exact measure, and which costs must be excluded from each request?

Rule last verified