Skip to content
Get in touch
Is There Help to Fund This?

Mount Prospect pilotEdition 2026-08

Return to Worlds

Mount Prospect project file

Buy equipment

Identify the exact equipment, energy effect, useful life, vendor timing, and repayment capacity before comparing incentives with loans.

Before you spend: Preserve the quote and delay orders when an incentive needs reservation or preapproval; every financing route remains repayable and underwritten.

Work through this project in the Workbench

Assistance layers

Mechanisms worth sorting for this project

These are supported relationships, not eligibility decisions. The Workbench asks the facts that change whether a lead is current, conditional, specialized, or historical.

Sequence 1

ComEd Small Business Energy Savings

Authorized ComEd service providers assess eligible small-business facilities and guide qualifying electric-efficiency upgrades through installation and incentive processing.

Mechanism
A bundled utility pathway combining a no-cost assessment, measure selection, installation support, and incentive processing.
What it does
Lower the project cost
Why it appears
Qualifying electric-efficiency equipment may receive assessment and incentive support.
Administrator
Commonwealth Edison Company

Before you spend: Confirm reservation or preapproval before ordering equipment, signing a contract, or starting work.

Program lifecycle
Current / rolling
Visitor treatment
Worth checking now

This current pathway still requires program-specific eligibility and sequence checks.

Confirm ComEd reservation or preapproval before a project commitment

Date or rangeBefore ordering equipment, signing a contract, or beginning work when the measure requires reservation or preapproval

A commitment made before the required ComEd sequence may make the measure ineligible; the authorized provider must confirm the exact rule.

Date last verified

General 2026 Kickstart preapplication period ended March 31, 2026

Date or range2025-11-17 through 2026-03-31

Do not present the general Kickstart bonus as available; evaluate the underlying current small-business pathway and any measure-specific reservation separately.

Date last verified

Sequence 2

SBA Microloan Program

Approved nonprofit intermediaries make small repayable loans for working capital and eligible equipment or supplies; the intermediary sets credit decisions and terms.

Mechanism
Loan
What it does
Finance the remaining cost
Why it appears
An intermediary may make a repayable Microloan for eligible machinery or equipment.
Administrator
U.S. Small Business Administration and approved nonprofit intermediaries
Program lifecycle
Current / rolling
Visitor treatment
Worth checking now

This current pathway still requires program-specific eligibility and sequence checks.

Sequence 3

Advantage Illinois

Participating lenders may use state participation or a state guarantee to reduce lender risk on an otherwise qualifying small-business loan.

Mechanism
Loan
What it does
Finance the remaining cost
Why it appears
A participating lender may use state support within a repayable equipment loan.
Administrator
Illinois Department of Commerce and Economic Opportunity
Program lifecycle
Current / rolling
Visitor treatment
Worth checking now

This current pathway still requires program-specific eligibility and sequence checks.

Sequence 4

Cook County Small Business Source

The Source connects Cook County small businesses to no-cost one-on-one advisers, resources, events, and capital-readiness help.

Mechanism
Advising
What it does
Get free expertise
Why it appears
County advisers can help prepare a capital request and identify relevant lending partners.
Administrator
Cook County Bureau of Economic Development
Program lifecycle
Current / rolling
Visitor treatment
Worth checking now

This current pathway still requires program-specific eligibility and sequence checks.

Sequence 80

Cook County BRITE

BRITE may fund reviewer-recommended pollution-prevention, energy, water, or equipment improvements for qualifying suburban Cook County businesses in named industries, but the remaining 2026 timing is urgent and unconfirmed.

Mechanism
Grant
What it does
Lower the project cost
Why it appears
BRITE can support reviewer-recommended equipment and pollution-prevention improvements for a short list of suburban Cook County industries.
Administrator
Cook County Department of Environment and Sustainability

Before you spend: Do not order equipment or rely on an award until Cook County confirms current feasibility, eligible scope, agreement timing, and funds.

Program lifecycle
Specialized
Visitor treatment
Specialized possibility

This specialized pathway requires its stated purpose or industry fit before reliance.

BRITE funds must be spent within 100 days of agreement or by September 30, 2026

Date or rangeWithin 100 days of agreement or by 2026-09-30, whichever comes first

Because the program review can take 30 to 60 days, a new award may not fit the remaining schedule; confirm feasibility immediately and do not assume funds or an award.

Date last verified

Ask the administrator: Can a new Mount Prospect applicant still complete the 30-to-60-day review and spend an award within 100 days of agreement or by September 30, 2026?

Stop: this is not a current lead. Read every material date and consequence before opening the historical record.

Manufacturing Reinvented was not accepting applications on August 27, 2026

Date or rangeStatus checked 2026-08-27

Keep the record historical and expose no Apply action unless Cook County later publishes and a new edition verifies a reopened application period.

Date last verified

Sequence 92

Manufacturing Reinvented

Cook County's official program surface states that Manufacturing Reinvented is not accepting applications.

Mechanism
Historical manufacturing-support opportunity retained only to stop a stale search result.
What it does
Avoid a stale or misleading lead
Why it appears
A manufacturer may encounter the program in search, but Cook County says applications are not being accepted.
Administrator
Cook County Government
Program lifecycle
Closed / historical
Visitor treatment
Expired, closed, on hold, or historical

Manufacturing Reinvented was not accepting applications on August 27, 2026

Stop: this is not a current lead. Read every material date and consequence before opening the historical record.

The 2025 Made in Illinois round is closed; no 2026 round was verified

Date or range2025 round closed; no 2026 round found as of 2026-08-27

Do not carry the 2025 opportunity into current results; a future round requires a new authoritative program and application check.

Date last verified

Sequence 93

Made in Illinois Grant Program

The 2025 Made in Illinois round is closed, and no 2026 round was found in the verified official program surface.

Mechanism
Historical manufacturing opportunity retained only to stop a stale search result.
What it does
Avoid a stale or misleading lead
Why it appears
A manufacturer may find the 2025 opportunity, but that round is closed and no 2026 round was verified.
Administrator
Illinois Manufacturing Excellence Center
Program lifecycle
Closed / historical
Visitor treatment
Expired, closed, on hold, or historical

The 2025 Made in Illinois round is closed; no 2026 round was verified